    Hi friends,

    My office plans to invest in setting up a new embedded system
    development facility.
    Our prime business is industrial desing & manufacturing .The new
    facility will develop industrial automation applications that will be
    piggybacked on our company's products.
    So we are starting from scratch.

    The applications will be industrial control like material handling or
    closed loop valve control etc., using typical sequnce logic and/or PID
    loops.(What i mean is it is not safety critical/ mission critical like
    missile control automotive safety control. )

    I am given the task for preparing a proposal & roadmap for this
    project.

    this task includes

    identifying resource requirements
    identifying skill set requirements
    gap analysis
    preparing specifications for development environment
    identifying business partners
    preparing procurement notes
    fixing up contracts
    training HR
    project reporting
    handing over the facility to development team.

    The time horizon is 6 months from start date

    I am looking for some help from the forum in successfully completing
    this project.

    I started out like this

    Resource reqmts :

    1) Infrastructure

    built area, no of seats (approx 5),amenities (power,water,recreation)

    2) Development setup

    Architecture (undecided yet) - 8 bit,16 bit,32 bit

    Indep Software Devpt tools : Source code editor,compiler
    (cross-compiler?)
    Dependent s/w devpt tools : assembler linker simulator
    Hardware tools :incircuit emulator,device programmer
    Test & meaurement:Scope,Logic analyser,Function
    generator,Timer/counter,Datalogger
    Power supply:AC/DC
    RTOS :(?)
    Training boards :

    3) Skill set requirement
    (Yet to start)

    4) Identifying business partners
    (Got some leads in EE directory site, but do not know where to start)


    Pl do share whatever you think may help a new startup lab,so as to make
    it more effective

    Looking forward for your valuable guidance

    karthikeyan
    Devicer, Mar 5, 2006
    #1
    1. Advertising

  2. Devicer

    larwe Guest

    Devicer wrote:

    > Our prime business is industrial desing & manufacturing .The new
    > facility will develop industrial automation applications that will be
    > piggybacked on our company's products.


    Translation: We have a few lashed-together in-house products and
    someone said "Hey, we could sell this dross!"

    > Pl do share whatever you think may help a new startup lab,so as to make
    > it more effective


    Translation: Please do my job for me.
    larwe, Mar 5, 2006
    #2
    1. Advertising

  3. Devicer

    Tim Wescott Guest

    Devicer wrote:

    > Hi friends,
    >
    > My office plans to invest in setting up a new embedded system
    > development facility.
    > Our prime business is industrial desing & manufacturing .The new
    > facility will develop industrial automation applications that will be
    > piggybacked on our company's products.
    > So we are starting from scratch.
    >
    > The applications will be industrial control like material handling or
    > closed loop valve control etc., using typical sequnce logic and/or PID
    > loops.(What i mean is it is not safety critical/ mission critical like
    > missile control automotive safety control. )
    >
    > I am given the task for preparing a proposal & roadmap for this
    > project.
    >
    > this task includes
    >
    > identifying resource requirements
    > identifying skill set requirements
    > gap analysis
    > preparing specifications for development environment
    > identifying business partners
    > preparing procurement notes
    > fixing up contracts
    > training HR
    > project reporting
    > handing over the facility to development team.
    >
    > The time horizon is 6 months from start date
    >
    > I am looking for some help from the forum in successfully completing
    > this project.
    >
    > I started out like this
    >
    > Resource reqmts :
    >
    > 1) Infrastructure
    >
    > built area, no of seats (approx 5),amenities (power,water,recreation)
    >
    > 2) Development setup
    >
    > Architecture (undecided yet) - 8 bit,16 bit,32 bit
    >
    > Indep Software Devpt tools : Source code editor,compiler
    > (cross-compiler?)
    > Dependent s/w devpt tools : assembler linker simulator
    > Hardware tools :incircuit emulator,device programmer
    > Test & meaurement:Scope,Logic analyser,Function
    > generator,Timer/counter,Datalogger
    > Power supply:AC/DC
    > RTOS :(?)
    > Training boards :
    >
    > 3) Skill set requirement
    > (Yet to start)
    >
    > 4) Identifying business partners
    > (Got some leads in EE directory site, but do not know where to start)
    >
    >
    > Pl do share whatever you think may help a new startup lab,so as to make
    > it more effective
    >
    > Looking forward for your valuable guidance
    >
    > karthikeyan
    >

    I suspect that you're going about this backwards, or perhaps sideways.
    If you first decide how many developers you need, then the capacity of
    the processors, you will only succeed if you happen to luck out with a
    set of tasks that fit that size team and that size processor.

    I think that you'd be much better off having someone come in (a
    permanent or temporary business partner, perhaps) to look at what you
    want to do, translate your requirements into something that a
    development team might like to see, then make some educated guesses
    about the size of said development team and the requirements on the
    processor.

    I notice that you seem to want to start up-front with a processor
    choice. If I were in charge of this effort I would make some general
    decisions about the capabilities required from the processor and deduce
    the processor size, then get input from the actual team on the processor
    selection. I would do this because everyone has their own likes and
    dislikes in processors, and getting to select the first processor will
    make for a happier team. Part of the processor selection process should
    be the selection of tool chain and RTOS (if necessary) -- tool,
    processor and RTOS selection all interact somewhat, so it's best to make
    the decisions at once.

    I would make sure that each electrical and software engineer has their
    own scope. In general the software guys just need scopes that will let
    them see signals wiggle, and the electrical guys will need better scopes
    to see _how_ the signals are wiggling. I'd get name-brand (Agilent,
    Tek, LeCroy) scopes -- compare the cost of the engineer against the cost
    of the scope; even if you're setting up in China it makes sense to speed
    them on their way with good equipment.

    The skill set should reflect what you're building. At a guess I'd say
    you need some good basic digital, some embedded software, and probably
    some general-purpose or power analog -- but as I said, that's just a guess.

    I don't know what the expectation is for amenities in your area, but
    where I come from you can have weight rooms and swimming pools and even
    dancing girls -- but if management treats the engineers like dirt
    they'll be unhappy and it'll show in their work. Conversely you can get
    amazing things done in a poorly heated building with smells and noises
    if the team really feels appreciated. Best, of course, is good
    management, a warm room, _and_ dancers, but that's a rare work environment.

    --

    Tim Wescott
    Wescott Design Services
    http://www.wescottdesign.com

    Posting from Google? See http://cfaj.freeshell.org/google/
    Tim Wescott, Mar 5, 2006
    #3
  4. Devicer

    Devicer Guest

    larwe wrote:
    > Devicer wrote:
    >
    > > Our prime business is industrial desing & manufacturing .The new
    > > facility will develop industrial automation applications that will be
    > > piggybacked on our company's products.

    >
    > Translation: We have a few lashed-together in-house products and
    > someone said "Hey, we could sell this dross!"
    >
    > > Pl do share whatever you think may help a new startup lab,so as to make
    > > it more effective

    >
    > Translation: Please do my job for me.


    Hi Larwe,
    I have a few clarifications

    1)The applications are presently Solid state systems - served their
    good life already.Hence we are driven by our customers to upgrade the
    controls and not the other way as u mentioned.

    2) I do not intend to ask others to do my job :)
    Forum or no Forum, a facility will be there six months from now.
    Pl do not translate others requirements & project your opinion on them

    Thanks for your time & comments

    karthikeyan
    Devicer, Mar 6, 2006
    #4
  5. Devicer

    Devicer Guest

    Dear wescott,
    Thanks for those valuable views,

    1) I will take the team into confidence before decision on
    architecture.

    2)Your views on measurement tools is agreed.The team is free to play
    around within the given outlay.

    3)My coincern is to After sales service,user training & warrantee
    conditions in this industry.

    I am blank about these embedded field.

    Our office has its standard contract phrases but it is prepared with
    COTS automation systems context.

    I would like to know if any special cautions to be taken in these area
    during buying development tools & test devices.

    Just a check so that i dont miss the obvious :)

    Thanks again for those valuable suggestions.

    btw, I am planning to dcoument the process as it happens -on this forum
    Devicer, Mar 6, 2006
    #5
  6. Devicer

    Devicer Guest

    Dear wescott,
    Thanks for those valuable views,

    1) I will take the team into confidence before decision on
    architecture.

    2)Your views on measurement tools is agreed.The team is free to play
    around within the given outlay.

    3)My coincern is to After sales service,user training & warrantee
    conditions in this industry.

    I am blank about these embedded field.

    Our office has its standard contract phrases but it is prepared with
    COTS automation systems context.

    I would like to know if any special cautions to be taken in these area
    during buying development tools & test devices.

    Just a check so that i dont miss the obvious :)

    Thanks again for those valuable suggestions.

    btw, I am planning to dcoument the process as it happens -on this forum
    Devicer, Mar 6, 2006
    #6
  7. Devicer

    Thad Smith Guest

    Devicer wrote:

    > My office plans to invest in setting up a new embedded system
    > development facility.
    > Our prime business is industrial desing & manufacturing .The new
    > facility will develop industrial automation applications that will be
    > piggybacked on our company's products.
    > So we are starting from scratch.


    One of the biggest questions for me is make or buy. There are a lot of
    companies selling automation products. You can save precious time to
    market by buying proven products and integrating, rather than designing
    from scratch. Later, after you have proven the market for your new
    products, you can do lower level design and customization to better
    match your customer needs and reduce cost.

    --
    Thad
    Thad Smith, Mar 9, 2006
    #7
    1. Advertising

Want to reply to this thread or ask your own question?

It takes just 2 minutes to sign up (and it's free!). Just click the sign up button to choose a username and then you can ask your own questions on the forum.
Similar Threads
  1. Stephen Hartz
    Replies:
    0
    Views:
    282
    Stephen Hartz
    May 26, 2004
  2. Replies:
    4
    Views:
    261
  3. Replies:
    0
    Views:
    514
  4. Jorl Shefner

    iChat AV and facility firewire

    Jorl Shefner, Nov 18, 2003, in forum: Apple
    Replies:
    0
    Views:
    168
    Jorl Shefner
    Nov 18, 2003
  5. Uli Wienands

    Backup facility/program

    Uli Wienands, Jul 27, 2004, in forum: Apple
    Replies:
    13
    Views:
    333
    Jason
    Jul 29, 2004
Loading...

Share This Page