Task creation in real-time OS

Discussion in 'Embedded' started by fp, Feb 1, 2008.

  1. fp

    fp Guest

    Hi,

    Recently I am starting to look at real-time OS for embedded systems.
    Most books and articles only have trivial examples, such as a "keypad
    task" to control a "flashing led task." In real-world applications,
    are there guidelines on how to break an application into tasks, such
    as
    - when to create a task
    - "granularity" or size of a task
    - max number of tasks in an application

    Thank you for your insight.

    S.C.
     
    fp, Feb 1, 2008
    #1
    1. Advertisements

  2. Be sure to search the archives for this ng. The question has been answered
    before, and not too long ago.

    Scott
     
    Not Really Me, Feb 1, 2008
    #2
    1. Advertisements

  3. fp

    Tim Wescott Guest

    I learned all this on the job, so I can't recommend a book.

    Create a task when the situation has changed enough to warrant it, and
    when it's safe. For all of the systems I've worked on this time is
    system startup, and none other. Memory is bulky, expensive, and power-
    hungry, so one is generally resource constrained -- the last thing you
    want is to set yourself up for the OS crashing in the field when one
    extra task is created, or even for that one extra thing failing because
    the OS couldn't allocate memory.

    Task granularity is a judgment call, but be guided by the word 'task':
    assign a task to carry out a task. An example that I can give from
    personal experience is having to drive three axes on closed-loop in a
    coordinated fashion: I'll have one task for each axis, and one task to do
    the coordination.

    The maximum number of tasks is also a judgment call, and heavily
    dependent on your application, but it's aided by the fact that task
    switches take time and tasks take memory. I'd say it's the minimum
    number that is sensible for you, unless for some reason you have oceans
    of memory.

    --
    Tim Wescott
    Control systems and communications consulting
    http://www.wescottdesign.com

    Need to learn how to apply control theory in your embedded system?
    "Applied Control Theory for Embedded Systems" by Tim Wescott
    Elsevier/Newnes, http://www.wescottdesign.com/actfes/actfes.html
     
    Tim Wescott, Feb 1, 2008
    #3
  4. fp

    Thad Smith Guest

    The first cut, for me, is to determine logical tasks. A logical task is
    something that has sequential processing and it fairly independent of other
    processing within the system. An example is controlling an interactive
    front panel with display and keypad while the system is controlling
    something independently of the keypad entries.

    If everything in the system is done sequentially, single task code works
    fine. If the system has the appearance of several things happening
    simultaneously that are not in lock step, there are several logical tasks,
    one for each independent process.

    The easiest mapping is one OS task for each logical task. A logical task
    can sometimes be done entirely in an interrupt routine, eliminating the
    need for an OS task. Sometimes there are constraints, such as memory or
    timing, that require a single OS task to perform more than one logical task.

    My suggestion is to create a new task only when it is associated with
    sequential behavior over a period of time that can't be done while
    everything else, except interrupt processing, is on hold.
     
    Thad Smith, Feb 2, 2008
    #4
    1. Advertisements

Ask a Question

Want to reply to this thread or ask your own question?

You'll need to choose a username for the site, which only take a couple of moments (here). After that, you can post your question and our members will help you out.